RFB for DB-130
Bay Corridor Transmission and Distribution - Phase 3 (2019) [BID TABULATION]

Bid due

01/23/2020
2:00 PM

  • Type Professional Services
  • Department Power Enterprise
BACK TO CONTRACTS & BIDS LIST
Project Description
The San Francisco Public Utilities Commission (“SFPUC”), a department of the City and County of San Francisco (the "City"), seeks to retain the services of a Design- Builder (“DB”) to provide design and construction services for the Bay Corridor Transmission and Distribution ("BCTD") - Phase 3 ("P3") or ("BCTD P3 Project") located in San Francisco, CA. Please note that the terms “SFPUC,” “City,” and “City Representative” are used interchangeably throughout this Request for Bids (“RFB”) and all the Bid-related documents.

Design Build services will include, but are not be limited to: (1) Scope 1: Providing design, engineering, permitting, procurement of labor, materials procurement, construction, delivery, installation, testing, and commissioning of high voltage electrical 230/12.47 kV electrical gas-insulated substation system and all integral components for a fully functioning substation; (2) Scope 2: Provide/pull new 230 kV power conductors and two fiber optic cables through the existing underground conduit infrastructure constructed as part of other Bay Corridor Transmission and Distribution contracts, between PG&E Potrero Substation and a new substation, plus related electrical equipment; (3) Scope 3: Provide/pull new 15 kV power conductors and fiber optic cables through the existing underground conduit infrastructure constructed as part of other Bay Corridor Transmission and Distribution contracts, from the substation to customers described in Section 01 11 00 Summary of Work, plus related electrical equipment; (4) Scope 4: Providing new 12 kV-480V submersible transformer inside an existing vault at the Mariposa Pump Station site; (5) Scope 5: Providing new interrupter in existing vault, and providing new 12 kV-4160V submersible transformer inside an existing vault at Booster Pump Station site. The SFPUC at its discretion may request the selected Design-Builder to provide other related specialized services.

The Local Business Enterprise (“LBE”) subconsulting and subcontracting participation requirement for this Project is 15% for Design (Pre-Construction) Services and 13% for Construction Services, respectively. Refer to Section 7.00, below.

The Local Hiring Goal for the Construction Phase of the Project is 30%.

The Project is subject to the requirements of the Water System Improvement Program Project Labor Agreement (‘WSIP PLA”) and the Second Addendum, thereto, dated July 23, 2019, collectively “PLA”.

SFPUC will only consider Bids from entities that are pre-qualified under the DB-130 RFQ. As of November 4, 2019, these entities are:

Beta Engineering California LP

Henkels & McCoy, Inc. with Black & Veatch Corporation

Proven Management, Inc. with AGS, Inc., BKF Engineers, RMA Group, and Rosendin Electric, Inc.

No further pre-qualification applications are being accepted at this time.  For further information, please visit the RFQ for DB-130 webpage at: https://sfwater.org/bids/DocList.aspx?bidid=3198.

To obtain Contract Documents, email qbd@sfwater.org with this Contract No. DB-130, the firm name, full address, email address, phone number, a copy of contractor’s license or business card, and a copy of a government-issued identification.  Please be advised that prior to receiving these materials, all purchasers will be required to complete, sign and fully comply with a Confidentiality Agreement, available under the Documents tab of this webpage.

Request for proposal

  • ESTIMATED COST
    $55,000,000
  • DUE DATE
    01/23/2020
  • DUE TIME
    2:00 PM
  • DURATION
  • LOCATION
    525 Golden Gate Avenue - 3rd Floor, Tuolumne Conference Room, San Francisco, CA 94102
  • CONTACT
    Contract Administration Bureau

Pre-Submittal Conference

  • DATE
    12/04/2019
  • TIME
    9:00 AM
  • ATTENDANCE
    Not Mandatory
  • LOCATION
    525 Golden Gate Avenue - 3rd Floor, Tuolumne Conference Room, San Francisco, CA 94102
  • ADVERTISEMENT DATE
    11/20/2019
LIST OF CERTIFIED LBE FIRMS AT HRC WEBSITE