Bid Details
WW-647R
Request / Notice for Proposal for Digester Building (B-610) Mechanical T-09.07 Metal Panel System [NOTICE OF INTENT TO AWARD LIST]
Bid due
09/06/2021
12:00 PM
- Type
Professional Services
- Department
Infrastructure
BACK TO CONTRACTS & BIDS LIST
- Project Description
-
Notice of Intent to Award List available in Documents
While information may be periodically added to this Project Description page, it exists only as a courtesy. Please only rely on official updates provided by MWH Constructors / Webcor Builders Joint Venture and MWH/Webcor's BuildingConnected website.
https://www.sepbiosolids.com/bid-opportunities-rfp
Request / Notice for Proposal for Digester Building (B-610) Mechanical – process piping, supports, Electrical, Process Equipment associated with the wastewater treatment process, Controls – DCS, PCIS, Instrumentations, Integration and Building Services for packages listed below:
T-09.07 Metal Panel System Supply and installation of exterior metal panel system, including zinc concealed and composite panel systems, flashing and complete air barrier for all exterior system including air barrier underneath fiber cement panels.
WW-647R Biosolids Digester Facilities Project Southeast Water Pollution Control Plant San Francisco Public Utilities Commission City and County of San Francisco
Project Description
The Biosolids Digester Facilities Project (BDFP) aims to replace the existing digester facilities with new, expanded, reliable, modern facilities as well as improving odor control systems and upstream and downstream process systems.
The City and County of San Francisco, acting through the General Manager of the San Francisco Public Utilities Commission (SFPUC), has engaged MWH/Webcor JV to construct a facility within the wider BDFP. While information may be periodically added to this Project Description page, it exists only as a courtesy. Please only rely on official updates provided by MWH Constructors / Webcor Builders Joint Venture and MWH/Webcor's BuildingConnected website.
MWH Constructors / Webcor Builders Joint Venture website: https://www.sepbiosolids.com/
Bid opportunities may be found online via BuildingConnected at MWH/Webcor BuildingConnected Website:
https://app.buildingconnected.com/public/5f88c2a2434c30003918ea48
Advertisement for Trade Contractor Proposal
Subject to conditions prescribed by the City and County of San Francisco, CA, responses to this bid request are sought from qualified Trade Contractors.
Scope / Drawings
Bid due date, the Scope and Drawings for the packages mentioned above shall be included as Exhibits in the RFP Package that will be available in BuildingConnected to Trade Contractors
Pre-Bid / Outreach Meeting – Zoom Video Conference – August 10, 2021 at 1:00 PM PST - Attendance is voluntary, but strongly encouraged. Find the link below:
https://mwhwebcor.zoom.us/j/97395347719?pwd=MkVTNSt2NTV4UXdtRDZYRXpFL2F6QT09
Confidentiality of the information provided will be respected to the extent permitted by law.
Local Business Enterprise (LBE) Requirements
Each Bid Package has a specific LBE requirement that will be included in the RFP documents. Any proposals that fail to meet the Bid Package LBE requirement will be deemed non-responsive.
Disadvantaged Business Enterprise (DBE) Requirements
Trade Contractors are hereby notified that work to be performed under this contract will be in full or in part financed by the Clean Water State Revolving Fund (CWSRF), administered by the United States Environmental Protection Agency (US EPA) and the State Water Resources Control Board (SWRCB), and the Water Infrastructure Finance and Innovation Act (“WIFIA”), also administered by the US EPA. Trade Contractors shall comply with all applicable terms and conditions, special provisions, and reporting requirements, as set forth in these specifications, and as may be required by federal law, rule, or regulation. Refer to Contract Section 00 48 10.01 for more information. Trade Contractors are required to seek, and are encouraged to use, Disadvantaged Business Enterprises (“DBEs”) for their subcontracting and procurement needs. These requirements apply to all subcontracts for equipment, supplies, construction, and services. The SFPUC has adopted the following Fair Share Objectives for participation of DBEs in this SRF funded project. These are project-wide participation goals that the Contractor may seek to meet: MBE: 5.6%, WBE: 1.2%. The Local Hiring Goal for the Construction Phase of the BDFP Project is 30%.
In accordance with California Labor Code Sections 1771.1 and 1725.5, no contract can be awarded to a Proposer without proof that the Proposer and all identified subcontractors are currently registered with the California Department of Industrial Relations.
Questions
Direct all package specific questions through BuildingConnected.
|