- Project Description
-
An electronic version of the bidding forms is available by request. To request these materials, email qbd@sfwater.org with this Contract No. WW-747, the firm name, full address, email address, phone number, copy of contractor’s license or business card, and a copy of a government-issued identification. Visit https://webapps.sfpuc.org/bids/ for updates.
The objective of the project is to replace the existing Seacliff 1 Pump Station (S1S), currently located on a SFPUC-owned parcel within Golden Gate National Recreation Area (GGNRA) property, with a new underground pump station located within the public ROW on Seacliff Avenue in San Francisco, California. Gravity sewer and force main replacement work is located within the Public ROW on Seacliff Avenue and El Camino Del Mar, and in the private driveway fronting 494 and 496 Seacliff Avenue. New mechanical and electrical cabinets along with new security fencing will replace existing cabinets located within GGNRA property. The work is to be performed in San Francisco, California.
Bid discounts may be applied as per San Francisco Administrative Code Chapter 14B and Section 2.01 of CMD Attachment 1. The Local Business Enterprise (LBE) subcontracting requirement is 10.00%. The LBE subcontracting requirement can only be met with CMD certified San Francisco Micro and Small-LBEs. The LBE subcontractor participation requirement for this Contract is 10.00%. The LBE subcontractor participation requirement is below 20% due to the large amount of specialty work that involves pre-packaged underground pump station that only Contractors with specific qualifying experiences can perform. This project includes a high percentage of equipment procurement (e.g., mechanical valves, electrical and instrumentation equipment) that requires proportionately less labor to install compared to typical sewer projects. The main purpose of this project is to replace the existing Seacliff 1 Pump Station with a new underground pump station located within the public ROW on Seacliff Ave in SF to meet SFPUC Level of Services Goal. The installation of the specialty item also requires heavy coordination with shutdowns of the system and constrained to limited work hours which makes it harder to sub out the work. SFPUC-LBEs cannot be counted towards meeting the LBE subcontracting requirement(s). Prime and Joint Venture level LBE participation cannot be counted towards meeting any of the LBE subcontracting requirement(s). LBE subcontractors must be certified with CMD in the scope of work they are being listed to perform. All Bidders shall submit documented Good Faith efforts with their Bids as directed on CMD Form 2B, except those who exceed the above-stated subcontracting requirement(s) by at least 35%. Refer to CMD Attachment 1. Failure to comply with Chapter 14B requirements may result in a Bid being deemed non-responsive and ineligible for Contract award. Please contact Jovineth Cuntapay-Vitin at (415) 554-3136 or jovineth.cuntapay-vitin@sfgov.org for further information about the LBE requirements. Subcontracting opportunities may include, but not limited, to the following major types of work: saw cutting, excavation, paving, traffic control, and concrete work.
Interested Bidders are encouraged to attend by remote means a teleconference pre-bid and contractor networking conference to be held at 10:00 A.M on Wednesday, April 24th, 2024. To participate by remote means, please access the meeting at this website: https://sfwater.zoom.us/j/87947979273?pwd=aDlTQW9uRm4xcTB4elpva3FwOXQ3Zz09. The Meeting ID is 879 4797 9273 and meeting Passcode is 383151. To join, enter Meeting ID and click Join. When prompted, enter the meeting Passcode. To participate by phone, dial +1.213.338.8477 and enter the Meeting ID followed by # key. When prompted, enter the meeting Passcode and # key. Attendance of remote attendees will be completed at the end of the pre-bid meeting.
SFPUC encourages Bidders to complete the Safety Prequalification Web Form at https://sfpuc.org/construction-contracts/contract-opportunities-payments/prequalify-construction at least 3-weeks prior to the date of Bid opening in accordance with Section 00 21 13 – Instructions to Bidders. Bidders are required to pass the Safety Prequalification prior to SFPUC considering their bid submission complete. SFPUC will notify Bidders that have passed the Safety Prequalification prior to or on the date of Bid opening. Refer to Section 00 21 13 – Instructions to Bidders, “Bidder Qualifications” and the website listed above for additional information.
A Class “A” California Contractors License is required to bid. Furthermore, each listed subcontractor must possess appropriate active licenses for the work each subcontractor will be performing.
Funding for this project may be provided in full or in part by the Water Infrastructure Finance and Innovation Act (“WIFIA”). The contents of this document do not necessarily reflect the views and policies of the foregoing, nor does mention of trade names or commercial products constitute endorsement or recommendation for use. Utilization of Disadvantaged Business Enterprise (“DBE”) firms is encouraged. Bidder must take all necessary and reasonable steps to ensure that DBE firms have an opportunity to compete for, and participate in, performance on the project; information on DBE certification is available at the following link: https://dot.ca.gov/programs/business-and-economic-opportunity. In accordance with the DBE Good Faith Effort process, Bidders are required make information on forthcoming opportunities available to DBEs by posting solicitations for bids or proposals for a minimum of 30 calendar days before the bid opening date. As a prime Bidder, be sure to specifically state that you are seeking DBEs in the DBE Good Faith Effort process outlined above. The Bidder shall comply with all applicable terms and conditions, special provisions, and reporting requirements, as set forth in these specifications, and as may be required by federal law, rule, or regulation. Refer to specification Section 00 48 10 for more information.
|