Bid Details
WW-789
Southeast Water Pollution Control Plant 516 and 516A Sodium Bisulfite Storage Tanks and Fill Station

Bid due

12/04/2025
2:00 PM

  • Type Construction
  • Department Infrastructure
BACK TO CONTRACTS & BIDS LIST
Project Description
An electronic version of the bidding forms, contract specifications, drawings, and available project information are available by request. To request these materials, email qbd@sfwater.org with this Contract No. WW-789, the firm's name, full address, email address, phone number, copy of contractor’s license or business card, and a copy of a government-issued identification. Visit https://webapps.sfpuc.org/bids/ for updates. Please be advised that prior to receiving these materials, all requestors will be required to complete, sign, and comply with a Confidentiality Agreement.

The objective of the project is to construct a new chemical storage and delivery system. The new system will be located closer to the injection site and will meet regulatory and seismic standards identified in Wastewater Enterprise’s (WWE’s) level of service. The old/existing system will be demolished upon construction of new system. The work is to be performed in San Francisco, California.

Bid discounts may be applied as per San Francisco Administrative Code Chapter 14B and Section 2.01 of CMD Attachment 1. The Local Business Enterprise (LBE) subcontracting requirement is 15.00%. The LBE subcontracting requirement can only be met with CMD certified San Francisco Micro and Small-LBEs. The LBE subcontracting participation requirement is below 20% due to the involvement of complex Sodium Bisulfite system with specialized mechanical equipment including tanks, pumps, double-contained chemical piping, and chemical induction mixers. The sodium bisulfite system will be installed on a foundation built on top of torque down plies, which is included under specialized earthwork materials. The specialized mechanical equipment and torque down pile materials account for almost half of the engineer's cost estimate. PUC-LBEs cannot be counted towards meeting the LBE subcontracting requirement(s).
Prime and Joint Venture level LBE participation cannot be counted towards meeting any of the LBE subcontracting requirement(s). LBE subcontractors must be certified with CMD in the scope of work they are being listed to perform. All Bidders shall submit documented Good Faith efforts with their Bids as directed on CMD Form 2B, except those who exceed the above-stated subcontracting requirement(s) by at least 35%. Refer to CMD Attachment 1. Failure to comply with Chapter 14B requirements may result in a Bid being deemed non-responsive and ineligible for Contract award. Please contact Jovi Cuntapay-Vitin at (415) 554-0632 or jovineth.cuntapay-vitin@sfgov.org for further information about the LBE requirements. Subcontracting opportunities may include, but not limited, to the following major types of work: C-8 Concrete, C-10 Electrical, C-12 Earthwork & Paving, C-36 Plumbing, D-24 Metal products. Please refer to Section 01 60 00 in the Specifications regarding the purchase of equipment to achieve the LBE subcontracting participation requirement.

Interested Bidders are encouraged to attend by remote means a teleconference pre-bid and contractor networking conference to be held on 11/12/2025 at 10:00 AM. To participate by remote means, please access the meeting at this website: https://sfwater.zoom.us/j/86835486922?pwd=3WcRI8hpkUOjpektvSgZlGVLIsi87F.1 . The Meeting ID is 868 3548 6922 and meeting Passcode is 569081. To join, enter Meeting ID and click Join. When prompted, enter the meeting Passcode. To participate by phone, dial +1.213.338.8477 and enter the Meeting ID followed by # key. When prompted, enter the meeting Passcode and # key. Attendance of remote attendees will be completed at the end of the pre-bid meeting. SFPUC highly recommends that Bidders attend the Site inspection, which will be held at Southeast Plant, 750 Phelps Street, San Francisco, CA 94124 on 11/13/2025 at 10:00 AM. 

SFPUC encourages Bidders to complete the Safety Prequalification Web Form at https://www.sfpuc.gov/construction-contracts/contract-opportunities-payments/prequalify-construction at least 3-weeks prior to the date of Bid opening in accordance with Section 00 21 13 – Instructions to Bidders. Bidders are required to pass the Safety Prequalification prior to SFPUC considering their bid submission complete. SFPUC will notify Bidders that have passed the Safety Prequalification prior to or on the date of Bid opening. Refer to Section 00 21 13 – Instructions to Bidders, “Bidder Qualifications” and the website listed above for additional information.

A Class “A” California Contractors License is required to bid. Furthermore, each listed subcontractor must possess appropriate active licenses for the work each subcontractor will be performing.

Request for proposal

  • ESTIMATED COST
    $12,500,000
  • DUE DATE
    12/04/2025
  • DUE TIME
    2:00 PM
  • DURATION
  • LOCATION
    https://sfwater.zoom.us/j/87811945391?pwd=Q0JOVzRCbnBCb0lFWlRJbUt2MWRudz09
  • CONTACT
    Contract Administration Bureau at QBD@sfwater.org

Pre-Bid Conference

  • DATE
    11/12/2025
  • TIME
    10:00 AM
  • ATTENDANCE
    Not Mandatory
  • LOCATION
    https://sfwater.zoom.us/j/86835486922?pwd=3WcRI8hpkUOjpektvSgZlGVLIsi87F.1
  • ADVERTISEMENT DATE
    11/05/2025